BRIGGS & STRATTON 

Customer Success Story

Transforming Operations: How Axiom Ops Boosted Productivity for Briggs & Stratton

Briggs & Stratton, a renowned leader in the manufacturing of small engines and outdoor power equipment, faced significant operational challenges that were impeding their productivity and increasing costs. Seeking a transformative solution, they partnered with Axiom to streamline their operations and achieve greater efficiency. This case study explores the obstacles Briggs & Stratton encountered, the innovative strategies implemented by Axiom, and the remarkable results that followed, demonstrating the profound impact of expert operational management on a large-scale manufacturing environment.

Challenges - Relocating the Factory

Briggs & Stratton Corporation, a leading manufacturer of small engines based in Menomonee Falls, Wisconsin, faced a significant logistical challenge. They needed to relocate their current 316,000 square foot parts distribution facility to a smaller 298,000 square foot building within a tight timeframe of six months. The goal was to achieve this move cost-effectively while minimizing disruption to their operations and ensuring the continued smooth functioning of their supply chain.

Our Plan of action and solution

Due to budget restrictions, Axiom recommended that Briggs & Stratton utilize existing racking and purchase enough new, compatible racking to make the initial move, including 220 pallet rack uprights at 23’ h x 48” d, and 8,000 pieces of wire decking for the warehouse and mezzanine levels. The new racking was installed as a single row against the wall and two rows back-to-back creating 350 bays. Combined with existing racking, the new facility held a total of 1,850 bays. All new and existing racking was installed with a ¼ inch tolerance to accommodate a 70” narrow aisle, wire guarding picking vehicle. After the initial install of new racking at the smaller warehouse, the first round of product from the old facility was transferred and the remaining empty rack was disassembled, packaged, relocated, and reassembled in the new facility. This systematic transfer of product and racking continued for six months until relocation was complete. By using a combination of old and new racking and systematically moving materials to the new facility, Axiom was able to keep operations moving while maximizing space and accommodating budget.

Key MetricS AND ACHIEVEMENTS

Facility Size Reduction

Successfully relocated from a 316,000 square foot parts distribution facility to a smaller 298,000 square foot building.

Completion Time

Completed the relocation within the tight timeframe of six months.

Productivity Increase

Implemented advanced warehouse management systems that resulted in increased operational efficiency and improved workflow.

WE'RE HERE FOR YOU. Ask a question or GET a quote today!